Yippee!!! I received the Authorization to Construct on the Septic System. I am so relieved now all I need to do is find the money to build a mound system. The designer told me it would look like we tried to bury a bus. At least it will be relatively low maintenance and about 150 ft from the house.
It might even be a benefit to the local wildlife since it would promote green grass with the evaporating water.
PEC told me today they are hoping to obtain the easement this Wednesday from the State of Texas to put an electric line across Ranch Road 2338 for me .
I also did some research on a gate opener for the double wrought-iron gate. It looks like I can make it work by putting a transformer in the house and running the low voltage wire from the house back to the gate. Up to 1000 ft can be run and the house is less than 300 ft from the gate. I can also add an automatic lock, keypad and vehicle sensor for letting vehicles out. The transformer would keep the battery charged and then the battery can open the gate when power goes out.
I am also going to put a travel trailer on the land during the construction just to watch out for robberies. The normal RV outlets at camp grounds are 50 amp, I wonder if I need that much just for a 26 ft trailer?
Just wanted to share the good news. Thanks for reading.
Tuesday, November 22, 2011
Wednesday, November 16, 2011
Sewer Permit Not Approved
I had hoped not to have to fight with the Williamson County Health Dept but alas, it looks like that is not to be. My permit for the construction of a septic system at this point is "not approved".
It seems they are questioning the grey water system as well as the rainwater harvesting plan. The tank may be too close to the sewer, or rain runoff from the gutters may flood the sewer, I guess. I don't see how this is possible since I will be collecting all the rainwater and sending it under ground to the 10,000 gallon tank over 25 feet from the sewer tank. I hope we get these issues out of the way soon. Not something I want to worry about right now even though the septic system (OSSF) won't be put in until after we have a slab and the house construction is well on it's way. I suppose it is good to make sure there are no surprises.
I have decided on the Engineering firm to do the Foundation Engineering: John Carroll with Consolidated Reinforcement. He began the Engineering Design today. He says it shouldn't take long since my property is "perfect" to support a good foundation. I would guess so, it is fractured limestone about 18 inches down everywhere we dug test holes...over 16 of them. Good for foundation but bad for putting anything in the ground...septic tanks, drain fields, Liquid Propane tanks, Rainwater Harvesting Tanks and hard to put in fence posts but they don't move once in.
The area isn't called ROCKY HOLLOW for no reason!!
It seems they are questioning the grey water system as well as the rainwater harvesting plan. The tank may be too close to the sewer, or rain runoff from the gutters may flood the sewer, I guess. I don't see how this is possible since I will be collecting all the rainwater and sending it under ground to the 10,000 gallon tank over 25 feet from the sewer tank. I hope we get these issues out of the way soon. Not something I want to worry about right now even though the septic system (OSSF) won't be put in until after we have a slab and the house construction is well on it's way. I suppose it is good to make sure there are no surprises.
I have decided on the Engineering firm to do the Foundation Engineering: John Carroll with Consolidated Reinforcement. He began the Engineering Design today. He says it shouldn't take long since my property is "perfect" to support a good foundation. I would guess so, it is fractured limestone about 18 inches down everywhere we dug test holes...over 16 of them. Good for foundation but bad for putting anything in the ground...septic tanks, drain fields, Liquid Propane tanks, Rainwater Harvesting Tanks and hard to put in fence posts but they don't move once in.
The area isn't called ROCKY HOLLOW for no reason!!
Tuesday, November 15, 2011
Another Passive House
I found another Passive House under construction or rather retrofit. It is in Austin and is a young couple who are doing most of the work themselves. They almost totally torn down the house but due to lead and asbestos, they decided it was cheaper to cover it up instead of take it down. This is the result.
This area is just exploding with growth---of roads. At least the roads are ahead of the development but as soon as the developers see the economy change, they will also take off. My property is next to one developer's property on two sides and he told me this week, when he sees who gets in as President, he will be ready to build..he has over 1500 acres and is on both sides of the road above.
Still no Electricity to my property yet. PEC seems to be having trouble getting an easement across the 5-lane road. At least I don't have to pay for that!!
It started with a small 1000 sq ft house clad with limestone which Nick tore off and gave away to neighbors. He raised the roof 2.5 ft and incorporated the one-car garage to bring the size up to 1800 sq ft. He used high efficiency INLINE windows that are not cheap at first but over time will prove to be one of his best investments.
Notice how the windows are casement (no air infiltration) and set back in the wall so that they set over the insulation. His walls have an R value of over 50 since he was required to build two entire walls-one to cover the old asbestos wall and one for extra insulation and wiring. He only requires a 3/4 ton mini split heat pump for heat and A/C. Notice the ceiling has been raised and the use of lights to even increase the feeling of openness in the house.
Nick even salvaged the old growth pine from the old house for use around the ceiling. He also has a Hybrid Heat Pump Water Heater which is useful to keep humidity down and to add to the cooling of the house. His house is all electric and his bills ran $91/m for this past horrible hot summer and that was even with an Energy Recovery Ventilator that wasn't operating as efficiently as it should have.
As for my land, TDOT did me another favor and put my mailbox on a regular stand. I have even received mail at my new address.
We have another road going in behind my property...about a mile from me. It is an extension of the Ronald Reagan Blvd that will eventually tie into IH 35 north of Georgetown and connect to the toll road 130. This is also the road that will encourage travel along the road next to my property: CR 245 which will be a major cut-thru from RR 2338. That is probably why the intersection at CR 245 and RR 2338 will also have a traffic light.
Still no Electricity to my property yet. PEC seems to be having trouble getting an easement across the 5-lane road. At least I don't have to pay for that!!
Tuesday, November 8, 2011
Mailbox is back and new asphalt
We are making progress. The other side of RR 2338 has now been asphalted and is being striped for traffic. And my mailbox is back...yyipppeee. Any takers on how long it will be unmarked by the local yahoos with bats!
I am very proud of the bargain I found in Home Depot. I was looking at front doors and the price for the system with side lights and transome was between $3000 and $4000. I happened to be walking around the back of the door department in HD and found a door from the same manufacturer but at half the regular retail price. I checked the swing, width and height...it's the one I could use. It was prehung with hinges and the bottom thing.--no knob or deadbolt and had to be painted but had leaded glass and appeared to have no dings or scratches.
I hurried home, borrowed the neighbors pickup and the neighbor and hoped I could get back before it was bought by someone else. I made it and matter of fact I bought the two they had which are perfect for my front door and my door to the garage. I got both of them for the price of one.
This girl had an interesting job since she walked along the hopper and opened it when the road needed more of the asphalt. Did a good job.
I am very proud of the bargain I found in Home Depot. I was looking at front doors and the price for the system with side lights and transome was between $3000 and $4000. I happened to be walking around the back of the door department in HD and found a door from the same manufacturer but at half the regular retail price. I checked the swing, width and height...it's the one I could use. It was prehung with hinges and the bottom thing.--no knob or deadbolt and had to be painted but had leaded glass and appeared to have no dings or scratches.
I hurried home, borrowed the neighbors pickup and the neighbor and hoped I could get back before it was bought by someone else. I made it and matter of fact I bought the two they had which are perfect for my front door and my door to the garage. I got both of them for the price of one.
I did get delivery of the $700 loop for the electrical. Hopefully, it will get put on the pole soon and I can get some electricity out there.
I think, however, the one having the most fun was the guy on the Roller Machine. He was zooming up and down and just having a ball.
Tuesday, November 1, 2011
Electrical and Helpers
We are moving on the electrical connections. This is the location for the first pole which has to come from across RR 2338 which is 5 lanes to inside the corner of my property. All the lanes will be open soon but they have been building this road since 2009.
Dennis has built many custom homes but never a Passive House so he is learning right along with me what works for air tight houses. I still haven't convinced him of the benefits of Energy Recovery Ventilation and he keeps trying to sneak in more Air Conditioning and Dehumidification for me. We will see who is right once the house is all closed up.
Notice the traffic cone almost in the middle of the road..that is the marker for the traffic lane and also my mail box was locked to the top of it--I thought. Along came the neighborhood boys with bats and my mailbox went flying...got to find a better solution.
I also had a surprise when Williamson County paved my front driveway. They also put down the road base back to my front gate. THANKS. The pole in the distance is the takeoff point for my Electricity.
The marker for the second PEC pole is located to the side of my smooth drive. One guy who was delivering some temporary water tanks to me refused to drive on my road. AFRAID OF A LITTLE CHALLENGE ARE YA?
Notice how badly the oak trees look..it is a miracle they are still alive although a lot of them are probably not going to make it to next year. Would you believe EVEN the Cedars are dying?
This is Chase (John) Dame and a very important member of my team. He takes my crazy ideas and tries to put them on paper in a buildable(sic) fashion. We have been working with Dennis Celsor, (below) my consultant since the first of the year.