Blake and his guys began to clear the 120 ft by 40 ft area for the evaporation field.
The rocks they took out of the area to make it level were huge. I put my coffee cup on one rock to show the relative size. Once Blake began to take out the rocks, he dropped down into the shelf and it was difficult to find a place to stop pulling rocks out to get a level run.
The pile continues to build. I will keep the rocks for a future build of a dam on another part of the land.
Finally some top soil was brought in to start to build up the field.
Not complete yet but a good start.