Feb. 23, 2012 More Progress

The Doors and windows were installed today and we found several problems.
One of the windows did not have the handle mechanism..has been ordered.
This double glass french door had damage to the fiberglass in several places.  They are sending someone from the local ThermaTru Door place to fill it is and paint the three places.  
The back double door has the latch in backwards.  It has to have the correct latch and it isn't reversible so that has also been ordered.  Won't be here until mid March.  Not good since I can't lock the house since the door won't catch on the latch.  



Finally completed the roof but having problems getting the crew to understand the tape has to be pressured with a metal roller with some consistency.  I didn't think the tape was being applied correctly....turned out when the cold front blew in over night...sure enough the tape began to flap in the wind.  The crew will have to go over all this tape again.  We'll see if the roof is going to keep out the water since we expect rain as well.

No comments:

Post a Comment